Zundara·Companies on offerCall us0330 027 2159
Domiciliary care · CQC-registrable

Wrenbury Care Services

A complete, CQC application-ready domiciliary care agency. No premises required, low fixed costs, scalable hourly capacity. 407-document operating pack with 49 inline text previews from the actual files.

Companies House
Documents
408
Categories
14
Image previews
14
Live website
What is included on day one

Everything you need to start trading.

Business email
@wrenburycare.co.uk
Email accounts on the company domain — configured and ready.
Business phone
UK number
With call routing, voicemail, and customer-facing greeting.
Registered UK Limited Company
#17031767
Transferred into your name on handover.
Policies & Procedures
88 documents
The compliance backbone — the keyword every operator searches for.
Operational
72 documents
Day-to-day operating procedures, checklists, and runbooks.
Human Resources
56 documents
Contracts, recruitment pack, onboarding, training, performance.
Health & Safety
42 documents
Risk assessments, accident reporting, COSHH, training records.
Regulatory & Compliance
25 documents
Sector registration pack, compliance matrix, supporting evidence.
Financial
25 documents
Six financial models, budgeting, forecasting, accounting templates.
OctusCloud infrastructure
£150/mo
Email, web, phone, document management, platform support from handover.
Zundara strategic partnership
12% retained
You operate. We are alongside for as long as the venture exists.

Plus the full 408-document operating pack across 14 categories — browse the full library below.

About this company

Domiciliary care — the lowest-cost entry to regulated care.

Wrenbury delivers regulated personal care, medication support, and daily living assistance to adults in their own homes. Care workers visit clients on assessed schedules, delivering support against individual care plans, needs assessments, and outcome goals.

Revenue blends two streams: local authority commissioned hours (~80%) at £22/hour through framework agreements and spot purchasing, plus private self-funded clients (~20%) at £30/hour. The blended rate is £24/hour. The UK has over 10 million hours of unmet domiciliary care need per week — this is a structurally undersupplied market and councils are actively commissioning new capacity.

No premises required — care is delivered in clients' homes. The business runs from a registered office and a small operational base. Low fixed costs, scalable hourly capacity, and CQC application-ready from day one.

Key numbers
Year 2 revenue (modelled)
£542,508
LA + private blended
OctusCloud infrastructure
£150
Per month, heavy-regulatory tier
Zundara strategic stake
12%
You operate the business
Document library · 408 files in 14 categories

What you get on day one.

Click a preview thumbnail to view full page Documents without a preview are released at handover

Corporate & Legal

16 documents · 3 previewable
  1. A-000 Certificate of Incorporation
    .pdf v1.0 Preview
  2. A-001 Memorandum of Association
    .docx v1.0 Preview
  3. A-002 Articles of Association
    .docx v1.0 Preview
  4. A-003 Share Certificate 001
    .docx v1.0 At handover
  5. A-004 Register of Members
    .docx v1.0 At handover
  6. A-005 Register of Directors
    .docx v1.0 At handover
  7. A-006 Register of PSC
    .docx v1.0 At handover
  8. A-007 Register of Secretaries
    .docx v1.0 At handover
  9. A-008 Minutes First Board Meeting
    .docx v1.0 At handover
  10. A-009 Director Service Agreement
    .docx v1.0 At handover
  11. A-010 Company Secretarial Calendar
    .docx v1.0 At handover
  12. A-011 Register of Charges
    .docx v1.0 At handover
  13. A-012 Shareholders Agreement
    .docx v1.0 At handover
  14. A-013 Register Directors Residential Addresses
    .docx v1.0 At handover
  15. A-014 Written Resolution Template
    .docx v1.0 At handover
  16. A-015 Corporate Governance Framework
    .docx v1.0 At handover

Regulatory & Compliance

25 documents · 1 previewable
  1. B-001 Statement of Purpose
    .docx v1.0 Preview
  2. B-002 Service User Guide
    .docx v1.0 At handover
  3. B-003 Fit and Proper Persons Declaration
    .docx v1.0 At handover
  4. B-004 Nominated Individual Declaration
    .docx v1.0 At handover
  5. B-005 CQC Registration Application Checklist
    .docx v1.0 At handover
  6. B-006 CQC Compliance Matrix
    .docx v1.0 At handover
  7. B-007 Registered Manager Application Guide
    .docx v1.0 At handover
  8. B-008 CQC Statutory Notifications Guide
    .docx v1.0 At handover
  9. B-009 Local Authority Commissioning Guide
    .docx v1.0 At handover
  10. B-010 Conditions of Registration Guide
    .docx v1.0 At handover
  11. B-011 Regulatory Self Assessment Tool
    .docx v1.0 At handover
  12. B-012 Quality Assurance Framework
    .docx v1.0 At handover
  13. B-013 Annual Quality Account
    .docx v1.0 At handover
  14. B-014 Commissioner Quality Standards Compliance
    .docx v1.0 At handover
  15. B-015 CQC Rating Improvement Plan
    .docx v1.0 At handover
  16. B-016 Provider Information Return PIR Guide
    .docx v1.0 At handover
  17. B-017 Duty of Candour Compliance Guide
    .docx v1.0 At handover
  18. B-018 Modern Slavery and Human Trafficking Statement
    .docx v1.0 At handover
  19. B-019 CQC Enforcement Response Plan
    .docx v1.0 At handover
  20. B-020 Regulatory Change Management Procedure
    .docx v1.0 At handover
  21. B-021 Inspection Preparation Guide
    .docx v1.0 At handover
  22. B-022 Domiciliary Care Standards Framework
    .docx v1.0 At handover
  23. B-023 Local Authority Quality Standards Compliance
    .docx v1.0 At handover
  24. B-024 National Minimum Wage Travel Time Compliance Guide
    .docx v1.0 At handover
  25. B-025 Regulatory Compliance Annual Report
    .docx v1.0 At handover

Policies & Procedures

88 documents · 1 previewable
  1. C-001 Consent to Care and Treatment Policy
    .docx v1.0 Preview
  2. C-002 Confidentiality and Information Sharing Policy
    .docx v1.0 At handover
  3. C-003 Dignity and Respect Policy
    .docx v1.0 At handover
  4. C-004 Professional Boundaries Policy
    .docx v1.0 At handover
  5. C-005 Service User Rights and Advocacy Policy
    .docx v1.0 At handover
  6. C-006 Staffing and Contingency Policy
    .docx v1.0 At handover
  7. C-007 Record Keeping Policy
    .docx v1.0 At handover
  8. C-008 Service User Involvement and Co Production Policy
    .docx v1.0 At handover
  9. C-009 Communication Policy
    .docx v1.0 At handover
  10. C-010 Cultural and Spiritual Needs Policy
    .docx v1.0 At handover
  11. C-011 End of Life Care Policy
    .docx v1.0 At handover
  12. C-012 Nutrition and Hydration Policy
    .docx v1.0 At handover
  13. C-013 Continence Care Policy
    .docx v1.0 At handover
  14. C-014 Personal Care Delivery Policy
    .docx v1.0 At handover
  15. C-015 Safeguarding Adults Policy
    .docx v1.0 At handover
  16. C-016 Mental Capacity Act Policy
    .docx v1.0 At handover
  17. C-017 Medication Management Policy
    .docx v1.0 At handover
  18. C-018 Infection Prevention and Control Policy
    .docx v1.0 At handover
  19. C-019 Data Protection and GDPR Policy
    .docx v1.0 At handover
  20. C-020 Complaints Policy
    .docx v1.0 At handover
  21. C-021 Whistleblowing Policy
    .docx v1.0 At handover
  22. C-022 Duty of Candour Policy
    .docx v1.0 At handover
  23. C-023 Equality Diversity and Inclusion Policy
    .docx v1.0 At handover
  24. C-024 Business Continuity Plan
    .docx v1.0 At handover
  25. C-025 Lone Working Policy
    .docx v1.0 At handover
  26. C-026 Environmental and Sustainability Policy
    .docx v1.0 At handover
  27. C-027 Modern Slavery and Human Trafficking Statement
    .docx v1.0 At handover
  28. C-028 Information Security Policy
    .docx v1.0 At handover
  29. C-029 Records Management Policy
    .docx v1.0 At handover
  30. C-030 Training and Development Policy
    .docx v1.0 At handover
  31. C-031 Safeguarding Adults Policy Domiciliary Context
    .docx v1.0 At handover
  32. C-032 Safeguarding Children Policy
    .docx v1.0 At handover
  33. C-033 Self Neglect Policy
    .docx v1.0 At handover
  34. C-034 Modern Slavery and Human Trafficking Policy
    .docx v1.0 At handover
  35. C-035 PREVENT Duty Policy
    .docx v1.0 At handover
  36. C-036 Domestic Abuse Policy
    .docx v1.0 At handover
  37. C-037 Financial Abuse and Exploitation Policy
    .docx v1.0 At handover
  38. C-038 Mental Capacity Assessment Procedure
    .docx v1.0 At handover
  39. C-039 Best Interests Decision Making Policy
    .docx v1.0 At handover
  40. C-040 Deprivation of Liberty Safeguards and Liberty Protection Safeguards Procedure
    .docx v1.0 At handover
  41. C-041 Court of Protection Applications Policy
    .docx v1.0 At handover
  42. C-042 Advocacy Referral Procedure
    .docx v1.0 At handover
  43. C-043 Restraint and Restrictive Practice Policy
    .docx v1.0 At handover
  44. C-044 Coercive Control Recognition Policy
    .docx v1.0 At handover
  45. C-045 Multi Agency Working Policy
    .docx v1.0 At handover
  46. C-046 MARAC Referral Procedure
    .docx v1.0 At handover
  47. C-047 Hoarding and Self Neglect Protocol
    .docx v1.0 At handover
  48. C-048 Adult at Risk Monitoring Plan Policy
    .docx v1.0 At handover
  49. C-049 Medication Policy Domiciliary Care
    .docx v1.0 At handover
  50. C-050 MAR Chart Completion Policy
    .docx v1.0 At handover
  51. C-051 Controlled Drugs Policy
    .docx v1.0 At handover
  52. C-052 PRN Medication Policy
    .docx v1.0 At handover
  53. C-053 Medication Administration in Service Users' Homes Policy
    .docx v1.0 At handover
  54. C-054 Medication Errors and Near Misses Policy
    .docx v1.0 At handover
  55. C-055 Covert Medication Policy
    .docx v1.0 At handover
  56. C-056 Self Medication Support Policy
    .docx v1.0 At handover
  57. C-057 Medication Storage in Service Users' Homes Policy
    .docx v1.0 At handover
  58. C-058 Medication Ordering and Supply Policy
    .docx v1.0 At handover
  59. C-059 Medication Competency Assessment Policy
    .docx v1.0 At handover
  60. C-060 Homely Remedies Policy
    .docx v1.0 At handover
  61. C-061 Medication and Capacity Policy
    .docx v1.0 At handover
  62. C-062 Insulin Administration Policy
    .docx v1.0 At handover
  63. C-063 Topical Medication Policy
    .docx v1.0 At handover
  64. C-064 Oxygen Therapy Policy
    .docx v1.0 At handover
  65. C-065 Medication Disposal Policy
    .docx v1.0 At handover
  66. C-066 Medication Record Keeping Policy
    .docx v1.0 At handover
  67. C-067 Person Centred Care Delivery in the Home Policy
    .docx v1.0 At handover
  68. C-068 Travel Time and Scheduling Policy
    .docx v1.0 At handover
  69. C-069 Electronic Call Monitoring Policy
    .docx v1.0 At handover
  70. C-070 Key Safe Management Policy
    .docx v1.0 At handover
  71. C-071 Visit Continuity and Allocation Policy
    .docx v1.0 At handover
  72. C-072 Missed and Late Visits Policy
    .docx v1.0 At handover
  73. C-073 Service User Matching Policy
    .docx v1.0 At handover
  74. C-074 Flexible Scheduling and Responsiveness Policy
    .docx v1.0 At handover
  75. C-075 Night and Sleep In Care Policy
    .docx v1.0 At handover
  76. C-076 Reablement and Enablement Policy
    .docx v1.0 At handover
  77. C-077 Direct Payments Support Policy
    .docx v1.0 At handover
  78. C-078 Family and Informal Carer Partnership Policy
    .docx v1.0 At handover
  79. C-079 Complex Care in the Community Policy
    .docx v1.0 At handover
  80. C-080 Dual Diagnosis Support Policy
    .docx v1.0 At handover
  81. C-081 Hospital Discharge Support Policy
    .docx v1.0 At handover
  82. C-082 Falls Prevention in the Home Policy
    .docx v1.0 At handover
  83. C-083 Moving and Handling Domiciliary Policy
    .docx v1.0 At handover
  84. C-084 Assistive Technology Policy
    .docx v1.0 At handover
  85. C-085 Environmental Risk Assessment Service User Homes Policy
    .docx v1.0 At handover
  86. C-086 Winter and Severe Weather Policy
    .docx v1.0 At handover
  87. C-087 Emergency Response Lone Workers Policy
    .docx v1.0 At handover
  88. C-088 Live In Care Policy
    .docx v1.0 At handover

Operational

72 documents · 1 previewable
  1. D-001 Person Centred Care Plan Template
    .docx v1.0 Preview
  2. D-002 Initial Assessment Framework
    .docx v1.0 At handover
  3. D-003 Care Needs Assessment Tool
    .docx v1.0 At handover
  4. D-004 Risk Assessment Individual Service User
    .docx v1.0 At handover
  5. D-005 Support Plan Template
    .docx v1.0 At handover
  6. D-006 Review and Reassessment Procedure
    .docx v1.0 At handover
  7. D-007 Daily Visit Recording Standards
    .docx v1.0 At handover
  8. D-008 Handover and Communication Procedure
    .docx v1.0 At handover
  9. D-009 Hospital Admission and Discharge Procedure
    .docx v1.0 At handover
  10. D-010 End of Life Care Plan
    .docx v1.0 At handover
  11. D-011 Nutrition and Meal Planning
    .docx v1.0 At handover
  12. D-012 Continence Assessment and Care Plan
    .docx v1.0 At handover
  13. D-013 Falls Risk Assessment and Prevention
    .docx v1.0 At handover
  14. D-014 Moving and Handling Assessment
    .docx v1.0 At handover
  15. D-015 Skin Integrity and Pressure Care
    .docx v1.0 At handover
  16. D-016 Mental Health Support Plan
    .docx v1.0 At handover
  17. D-017 Sensory Impairment Support Plan
    .docx v1.0 At handover
  18. D-018 Communication Passport
    .docx v1.0 At handover
  19. D-019 Night Care Support Plan
    .docx v1.0 At handover
  20. D-020 Emergency Grab Pack Procedure
    .docx v1.0 At handover
  21. D-021 Service User Profile Document
    .docx v1.0 At handover
  22. D-022 Key Worker Responsibilities
    .docx v1.0 At handover
  23. D-023 Quality Assurance Framework
    .docx v1.0 At handover
  24. D-024 Internal Audit Schedule
    .docx v1.0 At handover
  25. D-025 Service User Satisfaction Survey
    .docx v1.0 At handover
  26. D-026 Spot Check Procedure
    .docx v1.0 At handover
  27. D-027 Care Coordinator Visit Reports
    .docx v1.0 At handover
  28. D-028 Outcome Measurement Framework
    .docx v1.0 At handover
  29. D-029 CQC Evidence Collection Guide
    .docx v1.0 At handover
  30. D-030 Management Information Dashboard
    .docx v1.0 At handover
  31. D-031 Benchmarking and Performance
    .docx v1.0 At handover
  32. D-032 Monthly Governance Report Template
    .docx v1.0 At handover
  33. D-033 Annual Quality Account
    .docx v1.0 At handover
  34. D-034 Service Improvement Plan
    .docx v1.0 At handover
  35. D-035 Learning from Incidents Framework
    .docx v1.0 At handover
  36. D-036 Lessons Learned Register
    .docx v1.0 At handover
  37. D-037 Electronic Care Planning System Guide
    .docx v1.0 At handover
  38. D-038 Electronic Call Monitoring System Guide
    .docx v1.0 At handover
  39. D-039 Mobile Device Policy Care Workers
    .docx v1.0 At handover
  40. D-040 Digital Record Keeping Standards
    .docx v1.0 At handover
  41. D-041 Telehealth and Remote Monitoring
    .docx v1.0 At handover
  42. D-042 Assistive Technology Assessment
    .docx v1.0 At handover
  43. D-043 GPS Lone Worker Tracking
    .docx v1.0 At handover
  44. D-044 Digital Scheduling Platform Guide
    .docx v1.0 At handover
  45. D-045 Electronic MAR Procedures
    .docx v1.0 At handover
  46. D-046 Digital Communication Tools
    .docx v1.0 At handover
  47. D-047 Data Entry Standards and Accuracy
    .docx v1.0 At handover
  48. D-048 System Access and Security
    .docx v1.0 At handover
  49. D-049 Technology Training for Care Workers
    .docx v1.0 At handover
  50. D-050 Digital Transformation Roadmap
    .docx v1.0 At handover
  51. D-051 Visit Schedule Template
    .docx v1.0 At handover
  52. D-052 Weekly Rota Template
    .docx v1.0 At handover
  53. D-053 Mileage and Travel Log
    .docx v1.0 At handover
  54. D-054 Key Safe Register
    .docx v1.0 At handover
  55. D-055 Service User Contact Directory
    .docx v1.0 At handover
  56. D-056 Staff Emergency Contact Sheet
    .docx v1.0 At handover
  57. D-057 Vehicle Inspection Checklist
    .docx v1.0 At handover
  58. D-058 Uniform and ID Badge Policy
    .docx v1.0 At handover
  59. D-059 Office Security Procedure
    .docx v1.0 At handover
  60. D-060 Equipment Inventory Register
    .docx v1.0 At handover
  61. D-061 Stationery and Supplies Ordering
    .docx v1.0 At handover
  62. D-062 Filing and Archiving Procedure
    .docx v1.0 At handover
  63. D-063 Post and Correspondence Handling
    .docx v1.0 At handover
  64. D-064 Telephone and Message Handling
    .docx v1.0 At handover
  65. D-065 Reception and Front Desk Procedure
    .docx v1.0 At handover
  66. D-066 Meeting Room Booking and Facilities
    .docx v1.0 At handover
  67. D-067 Office Housekeeping Standards
    .docx v1.0 At handover
  68. D-068 Business Cards and Stationery Standards
    .docx v1.0 At handover
  69. D-069 Complaints Procedure Detailed
    .docx v1.0 At handover
  70. D-070 Compliments Register and Recognition
    .docx v1.0 At handover
  71. D-071 Ombudsman Escalation Guide
    .docx v1.0 At handover
  72. D-072 Advocacy and Support for Complainants
    .docx v1.0 At handover

Human Resources

56 documents · 1 previewable
  1. E-001 Staff Handbook
    .docx v1.0 Preview
  2. E-002 Employment Contract Full Time Care Worker
    .docx v1.0 At handover
  3. E-003 Employment Contract Part Time Care Worker
    .docx v1.0 At handover
  4. E-004 Employment Contract Zero Hours
    .docx v1.0 At handover
  5. E-005 Employment Contract Bank Staff
    .docx v1.0 At handover
  6. E-006 Job Description Registered Manager
    .docx v1.0 At handover
  7. E-007 Job Description Care Coordinator
    .docx v1.0 At handover
  8. E-008 Job Description Senior Care Worker
    .docx v1.0 At handover
  9. E-009 Job Description Care Worker
    .docx v1.0 At handover
  10. E-010 Job Description Administrative Support
    .docx v1.0 At handover
  11. E-011 Person Specification Registered Manager
    .docx v1.0 At handover
  12. E-012 Person Specification Care Worker
    .docx v1.0 At handover
  13. E-013 Recruitment and Selection Policy
    .docx v1.0 At handover
  14. E-014 Safer Recruitment Procedure
    .docx v1.0 At handover
  15. E-015 Interview Score Sheets
    .docx v1.0 At handover
  16. E-016 Pre Employment Checklist
    .docx v1.0 At handover
  17. E-017 Induction Programme 12 Week
    .docx v1.0 At handover
  18. E-018 Care Certificate Workbook Guide
    .docx v1.0 At handover
  19. E-019 Probation Review Framework
    .docx v1.0 At handover
  20. E-020 Supervision Policy and Templates
    .docx v1.0 At handover
  21. E-021 Annual Appraisal System
    .docx v1.0 At handover
  22. E-022 Training Needs Analysis
    .docx v1.0 At handover
  23. E-023 Mandatory Training Matrix
    .docx v1.0 At handover
  24. E-024 Competency Assessment Framework
    .docx v1.0 At handover
  25. E-025 Disciplinary Policy and Procedure
    .docx v1.0 At handover
  26. E-026 Grievance Policy and Procedure
    .docx v1.0 At handover
  27. E-027 Absence Management Policy
    .docx v1.0 At handover
  28. E-028 Sickness Reporting Procedure
    .docx v1.0 At handover
  29. E-029 Annual Leave Policy
    .docx v1.0 At handover
  30. E-030 Flexible Working Policy
    .docx v1.0 At handover
  31. E-031 Maternity, Paternity and Shared Parental Leave
    .docx v1.0 At handover
  32. E-032 Equality and Diversity in Employment
    .docx v1.0 At handover
  33. E-033 Bullying and Harassment Policy
    .docx v1.0 At handover
  34. E-034 Staff Wellbeing and Support
    .docx v1.0 At handover
  35. E-035 Pay and Expenses Policy
    .docx v1.0 At handover
  36. E-036 DBS Update Service Guidance
    .docx v1.0 At handover
  37. E-037 Professional Boundaries Policy
    .docx v1.0 At handover
  38. E-038 Exit Interview Procedure
    .docx v1.0 At handover
  39. E-039 Training Strategy and Plan
    .docx v1.0 At handover
  40. E-040 Mandatory Training Schedule
    .docx v1.0 At handover
  41. E-041 Moving and Handling Training Record
    .docx v1.0 At handover
  42. E-042 Medication Administration Competency
    .docx v1.0 At handover
  43. E-043 Safeguarding Training Programme
    .docx v1.0 At handover
  44. E-044 Mental Capacity Act Training
    .docx v1.0 At handover
  45. E-045 First Aid Training Record
    .docx v1.0 At handover
  46. E-046 Food Hygiene Training
    .docx v1.0 At handover
  47. E-047 Infection Control Training
    .docx v1.0 At handover
  48. E-048 Communication Skills Training
    .docx v1.0 At handover
  49. E-049 Dementia Awareness Training
    .docx v1.0 At handover
  50. E-050 End of Life Care Training
    .docx v1.0 At handover
  51. E-051 Person Centred Care Training
    .docx v1.0 At handover
  52. E-052 Record Keeping Training
    .docx v1.0 At handover
  53. E-053 Lone Working Safety Training
    .docx v1.0 At handover
  54. E-054 Driver Safety and Vehicle Training
    .docx v1.0 At handover
  55. E-055 New Technology Training Programme
    .docx v1.0 At handover
  56. E-056 Continuous Professional Development Guide
    .docx v1.0 At handover

Financial

25 documents · 1 previewable
  1. F-001 Three Year Financial Projections
    .docx v1.0 Preview
  2. F-002 Monthly Cash Flow Forecast
    .docx v1.0 At handover
  3. F-003 Revenue Model and Pricing Strategy
    .docx v1.0 At handover
  4. F-004 Cost Structure Analysis
    .docx v1.0 At handover
  5. F-005 Break Even Analysis
    .docx v1.0 At handover
  6. F-006 Start Up Cost Schedule
    .docx v1.0 At handover
  7. F-007 Funding Requirements Summary
    .docx v1.0 At handover
  8. F-008 Banking Pitch Deck
    .docx v1.0 At handover
  9. F-009 Key Financial Ratios and Metrics
    .docx v1.0 At handover
  10. F-010 Management Accounts Template
    .docx v1.0 At handover
  11. F-011 VAT and Tax Planning Guide
    .docx v1.0 At handover
  12. F-012 Payroll and Pension Administration
    .docx v1.0 At handover
  13. F-013 Invoice and Credit Control
    .docx v1.0 At handover
  14. F-014 Petty Cash Procedure
    .docx v1.0 At handover
  15. F-015 Financial Procedures Manual
    .docx v1.0 At handover
  16. F-016 Budget Setting and Monitoring
    .docx v1.0 At handover
  17. F-017 Fee Uplift and Rate Negotiation Guide
    .docx v1.0 At handover
  18. F-018 Direct Payments and Individual Budgets Guide
    .docx v1.0 At handover
  19. F-025 Business Plan
    .docx v1.0 At handover
  20. F-X001 Master-Financial-Model
    .xlsx v1.0 At handover
  21. F-X002 Startup-Budget
    .xlsx v1.0 At handover
  22. F-X003 Management-Accounts
    .xlsx v1.0 At handover
  23. F-X004 KPI-Dashboard
    .xlsx v1.0 At handover
  24. F-X005 Hours-Calculator
    .xlsx v1.0 At handover
  25. F-X006 Financial-Risk-Register
    .xlsx v1.0 At handover

Risk & Insurance

20 documents · 1 previewable
  1. G-001 Risk Register
    .docx v1.0 Preview
  2. G-002 Risk Management Policy
    .docx v1.0 At handover
  3. G-003 Strategic Risk Assessment
    .docx v1.0 At handover
  4. G-004 Operational Risk Assessment
    .docx v1.0 At handover
  5. G-005 Business Continuity Plan
    .docx v1.0 At handover
  6. G-006 Disaster Recovery Plan
    .docx v1.0 At handover
  7. G-007 Insurance Programme Schedule
    .docx v1.0 At handover
  8. G-008 Professional Indemnity Guidance
    .docx v1.0 At handover
  9. G-009 Public Liability Risk Assessment
    .docx v1.0 At handover
  10. G-010 Employers Liability Compliance
    .docx v1.0 At handover
  11. G-011 Motor Fleet Insurance Guide
    .docx v1.0 At handover
  12. G-012 Cyber Risk Assessment
    .docx v1.0 At handover
  13. G-013 Climate and Environmental Risk
    .docx v1.0 At handover
  14. G-014 Pandemic Preparedness Plan
    .docx v1.0 At handover
  15. G-015 Risk Appetite Statement
    .docx v1.0 At handover
  16. G-016 Board Risk Report Template
    .docx v1.0 At handover
  17. G-017 Incident Investigation and Root Cause
    .docx v1.0 At handover
  18. G-018 Risk Assessment Templates Generic
    .docx v1.0 At handover
  19. G-019 Contractor and Subcontractor Risk
    .docx v1.0 At handover
  20. G-020 Reputational Risk Management
    .docx v1.0 At handover

Marketing & Business Development

15 documents · 1 previewable
  1. H-001 Marketing Strategy
    .docx v1.0 Preview
  2. H-002 Brand Guidelines
    .docx v1.0 At handover
  3. H-003 Website Content Plan
    .docx v1.0 At handover
  4. H-004 Social Media Strategy
    .docx v1.0 At handover
  5. H-005 Service Brochure Content
    .docx v1.0 At handover
  6. H-006 Referral Development Strategy
    .docx v1.0 At handover
  7. H-007 Commissioner Engagement Plan
    .docx v1.0 At handover
  8. H-008 GP and Health Professional Liaison
    .docx v1.0 At handover
  9. H-009 Community Outreach Programme
    .docx v1.0 At handover
  10. H-010 Testimonials and Case Studies Framework
    .docx v1.0 At handover
  11. H-011 Awards and Recognition Strategy
    .docx v1.0 At handover
  12. H-012 Partnership and Networking Plan
    .docx v1.0 At handover
  13. H-013 Digital Marketing and SEO Guide
    .docx v1.0 At handover
  14. H-014 Open Day and Event Planning
    .docx v1.0 At handover
  15. H-015 Recruitment Marketing
    .docx v1.0 At handover

Contracts & Agreements

14 documents · 1 previewable
  1. I-001 Service Level Agreement LA Commissioned Care
    .docx v1.0 Preview
  2. I-002 Service Level Agreement Private Self Funded
    .docx v1.0 At handover
  3. I-003 Care Worker Employment Contract Template
    .docx v1.0 At handover
  4. I-004 Agency Staff Agreement
    .docx v1.0 At handover
  5. I-005 Supplier and Contractor Terms
    .docx v1.0 At handover
  6. I-006 Confidentiality Agreement Staff
    .docx v1.0 At handover
  7. I-007 Confidentiality Agreement Third Party
    .docx v1.0 At handover
  8. I-008 Data Processing Agreement
    .docx v1.0 At handover
  9. I-009 IT Service Provider Agreement
    .docx v1.0 At handover
  10. I-010 Training Provider Agreement
    .docx v1.0 At handover
  11. I-011 Office Lease Summary
    .docx v1.0 At handover
  12. I-012 Vehicle Lease Hire Agreement
    .docx v1.0 At handover
  13. I-013 Insurance Broker Terms of Business
    .docx v1.0 At handover
  14. I-014 Professional Services Engagement Letter
    .docx v1.0 At handover

Document Control

1 documents
  1. INDEX-001 Document Index
    .xlsx v1.0 At handover

Health & Safety

42 documents · 1 previewable
  1. J-001 Health and Safety Policy
    .docx v1.0 Preview
  2. J-002 Fire Safety Procedure Office
    .docx v1.0 At handover
  3. J-003 Fire Risk Assessment Office
    .docx v1.0 At handover
  4. J-004 Risk Assessment Methodology
    .docx v1.0 At handover
  5. J-005 Lone Working Risk Assessment
    .docx v1.0 At handover
  6. J-006 Manual Handling Policy
    .docx v1.0 At handover
  7. J-007 COSHH Assessment
    .docx v1.0 At handover
  8. J-008 First Aid Policy
    .docx v1.0 At handover
  9. J-009 Accident and Incident Reporting Policy
    .docx v1.0 At handover
  10. J-010 Display Screen Equipment Policy
    .docx v1.0 At handover
  11. J-011 Driving at Work Policy
    .docx v1.0 At handover
  12. J-012 Vehicle Safety and Maintenance
    .docx v1.0 At handover
  13. J-013 Workplace Stress Management
    .docx v1.0 At handover
  14. J-014 Personal Safety and Violence at Work
    .docx v1.0 At handover
  15. J-015 Severe Weather and Business Disruption
    .docx v1.0 At handover
  16. J-016 Electrical Safety
    .docx v1.0 At handover
  17. J-017 Office Workplace Assessment
    .docx v1.0 At handover
  18. J-018 Pregnant Workers Risk Assessment
    .docx v1.0 At handover
  19. J-019 Young Workers Policy
    .docx v1.0 At handover
  20. J-020 Slips Trips and Falls Prevention
    .docx v1.0 At handover
  21. J-021 Work Equipment Policy
    .docx v1.0 At handover
  22. J-022 Environmental and Sustainability Policy
    .docx v1.0 At handover
  23. J-023 Infection Prevention and Control Policy Domiciliary
    .docx v1.0 At handover
  24. J-024 Hand Hygiene Procedure
    .docx v1.0 At handover
  25. J-025 PPE Policy Community Setting
    .docx v1.0 At handover
  26. J-026 Sharps and Clinical Waste
    .docx v1.0 At handover
  27. J-027 Outbreak Management Plan
    .docx v1.0 At handover
  28. J-028 Cleaning Standards Service User Homes
    .docx v1.0 At handover
  29. J-029 Laundry and Linen Domiciliary Context
    .docx v1.0 At handover
  30. J-030 Food Safety and Hygiene
    .docx v1.0 At handover
  31. J-031 COVID 19 and Respiratory Virus Procedure
    .docx v1.0 At handover
  32. J-032 Norovirus Management
    .docx v1.0 At handover
  33. J-033 MRSA and Multi Drug Resistant Organisms
    .docx v1.0 At handover
  34. J-034 IPC Audit Tool Domiciliary
    .docx v1.0 At handover
  35. J-035 Staff IPC Training and Competency
    .docx v1.0 At handover
  36. J-036 IPC Annual Report Framework
    .docx v1.0 At handover
  37. J-037 Environmental Risk Assessment Care Workers
    .docx v1.0 At handover
  38. J-038 Home Environment Safety Checklist
    .docx v1.0 At handover
  39. J-039 Hoarding and Cluttered Environment Procedure
    .docx v1.0 At handover
  40. J-040 Pest Infestation Response
    .docx v1.0 At handover
  41. J-041 Carbon Monoxide and Gas Safety
    .docx v1.0 At handover
  42. J-042 Water Safety Legionella Domiciliary Context
    .docx v1.0 At handover

Information Governance

20 documents · 1 previewable
  1. K-001 Data Protection Policy
    .docx v1.0 Preview
  2. K-002 Privacy Notice Service Users
    .docx v1.0 At handover
  3. K-003 Privacy Notice Staff
    .docx v1.0 At handover
  4. K-004 Data Protection Impact Assessment Procedure
    .docx v1.0 At handover
  5. K-005 Subject Access Request Procedure
    .docx v1.0 At handover
  6. K-006 Data Breach Management Policy
    .docx v1.0 At handover
  7. K-007 Information Asset Register
    .docx v1.0 At handover
  8. K-008 Record of Processing Activities
    .docx v1.0 At handover
  9. K-009 Data Retention Schedule
    .docx v1.0 At handover
  10. K-010 Information Sharing Protocol
    .docx v1.0 At handover
  11. K-011 Caldicott Principles Application
    .docx v1.0 At handover
  12. K-012 Freedom of Information Guide
    .docx v1.0 At handover
  13. K-013 Records Management Policy
    .docx v1.0 At handover
  14. K-014 Archiving and Disposal Procedure
    .docx v1.0 At handover
  15. K-015 Cyber Security Policy
    .docx v1.0 At handover
  16. K-016 Password and Access Management
    .docx v1.0 At handover
  17. K-017 Mobile Device and BYOD Policy
    .docx v1.0 At handover
  18. K-018 Social Media and Online Safety Policy
    .docx v1.0 At handover
  19. K-019 IG Training Framework
    .docx v1.0 At handover
  20. K-020 Annual IG Toolkit Assessment
    .docx v1.0 At handover

Branding & Assets

8 documents · 1 previewable
  1. L-001 Brand Identity Guidelines
    .docx v1.0 Preview
  2. L-002 Colour Palette Specification
    .docx v1.0 At handover
  3. L-003 Letterhead Template
    .docx v1.0 At handover
  4. L-004 Compliments Slip Template
    .docx v1.0 At handover
  5. L-005 Business Card Template
    .docx v1.0 At handover
  6. L-006 Email Signature Template
    .docx v1.0 At handover
  7. L-007 PowerPoint Template Guide
    .docx v1.0 At handover
  8. L-008 Social Media Asset Specifications
    .docx v1.0 At handover

Supplementary

6 documents
  1. SUPP-001 Buyer s Guide to Running a Domiciliary Care Agency
    .docx v1.0 At handover
  2. SUPP-002 First 90 Days Action Plan
    .docx v1.0 At handover
  3. SUPP-003 CQC Registration Roadmap
    .docx v1.0 At handover
  4. SUPP-004 Staff Recruitment and Onboarding Guide
    .docx v1.0 At handover
  5. SUPP-005 Referral Pipeline Development Strategy
    .docx v1.0 At handover
  6. SUPP-006 Technology and Systems Setup Guide
    .docx v1.0 At handover

The full files are released to the selected operator at handover, after both sides decide to proceed and the operating agreements are signed.

Express your interest →